The Hanover project by WSP was extremely complex to plan, coordinate, and execute. Being in central London, the site was very constrained. There was almost no place to store materials therefore on-site planning, including delivery schedules, had to be perfectly timed. See how the client used BIM Track to mitigate risks.

To download the case study, please complete the form.