Sound Transit’s ongoing expansion of Seattle’s light rail consists of a number of different extensions due to be completed in 2023. Find out how Hoffman Construction overcame coordination challenges on the track alignments, stations, and garages.
Using BIM Track, CÉH was able to resolve all 5 challenges and lead to a faster, more efficient workflow for the engineering firm and the project's stakeholders.
The renovation of this 111-year old hospital had a huge number of issues: over 1600 in all. With BIM Track’s collaboration platform, Jaynes Corp made it happen!
Renovating a building in a bustling neighborhood is never easy! But when Cap Ingelec needed a tool to coordinate its project, it turned to BIM Track.
In this free e-book, we break down the BIM coordination process from start to finish in a friendly guide packed with practical tips, anecdotes, and insights.
The Société québécoise des infrastructures needed to digitize its coordination processes, and turned to BIM Track to build its roadmap to make it happen.
This 127,000 m² hospital project in Stavanger, Norway, was voted the “World’s Best Digital Construction Project” at the 2018 Autodesk AEC Excellence Awards. Get an in-depth view of the coordination process used by COWI on the project.
Centro 27 is a mixed-use business center in the financial district of San José, Costa Rica. Download this case study to see how Blue AEC Studio performed BIM management on the project and overcame various coordination challenges using BIM Track.
Originally built in the 60s, the Salt Lake City International Airport is being rebuilt piece-by-piece through a series of projects. This case study gives an in-depth view into the coordination process used by Austin Commercial on the project.
351 on Braddell is a multi-tenant 7-storey industrial development which is centrally located in Singapore, in good proximity to collaborative clusters of established businesses and enterprises.
The Aix Marseille University's Luminy campus, built over 50 years ago, required renovation work. Find out how Bouygues Construction updated the center for the Faculties of Sciences, including meeting rooms and laboratories, in accordance with modern standards.
The growing number of patients and medical technology requirements called for an urgent renovation for the Jules Bordet Oncology Institute in the heart of the city of Brussels. Find out how SynthésArt managed the coordination process from giving stakeholders easy access to issues, to reducing project delays.
The Medical University of South Carolina needed to urgently create a new children’s health campus due to a loss of a previous facility.
See how McVeigh & Mangum Engineering improved the constructability of the project and met strict time constraints with BIM Track.
Read how DBM Vircon was hired to implement BIM across all stages of the project and manage coordination between 26 different consultants, contractors, and subcontractors working in 16 different pieces of software.
Read how OpenProject srl was hired to perform all of the design on the Bonfiglioli Riduttori spa Headquarters project across its 3 phases: conception, shop or construction drawings, and on-site direction.
WeBIM Technologies undertook the challenge of BIM coordination and modeling for the planning and construction of the first two Umami towers and their conjoined underground parking structures.
See for yourself how WSP implemented BIM Track to centralize the coordination process and facilitate cross-team communication in real-time during the construction of the complex Hanover Square project in central London.
See for yourself how Amberg Engineering streamlined their design coordination phase in the expansion of Stockholm’s Tunnelbana metro system with BIM Track.
This case study focuses on the application of open BIM (including BCFs and IFCs) for BIM coordination for the $227M extension of the Québec city Jean-Lesage international airport terminal, spanning 183m north of the existing building.