See for yourself how Amberg Engineering streamlined their design coordination phase in the expansion of Stockholm’s Tunnelbana metro system with BIM Track. Learn what processes they used to maximize their BIM coordination on a complex project (including using the federated model for calculation, design, communication and coordination). Find out the tangible results they had with BIM Track in reduction of issues, emails & much more.

To download the case study, please complete the form on the right-hand side.