This 127,000 m² hospital project in Stavanger, Norway, is currently one of the largest construction projects in northern Europe, and was voted the “World’s Best Digital Construction Project” at the 2018 Autodesk AEC Excellence Awards.

Stavanger University Hospital, Norway

Download this case study to find out how COWI is successfully coordinating the structural, electrical, and HVAC design of the project and solving challenges like:

  • Managing coordination within the tight time constraints of an overlapping design/construction schedule 
  • Effectively managing thousands of issues per building
  • Running and documenting up to 6 interdisciplinary coordination meetings per week
  • Quality control and communicating errors within the design group.

To download the case study, please complete the form.