This calculator is designed to give you an idea of where your team could generate a time-saving ROI using BIM Track. Our calculations are based on real-world data drawn from client case studies.
Using BIM Track’s clashes-to-issues feature could save your team
hours
per year
Assumption:
McVeigh & Mangum Engineering cut their coordination time in half by making extensive use of the clashes-to-issues feature on the Medical University of South Carolina renovation project. This calculator assumes a 20% time saving on the team’s total working hours.
Using BIM Track’s view in model feature could save your team
hours
per year
Assumption:
Austin Commercial estimated their team saved 2-5 mins per issue using this feature on the SLC International Airport Expansion Project. This calculator assumes a time-saving of 2 minutes per issue.
Using BIM Track’s in-context communication instead of email could save your team
hours
per year
Assumption:
Amberg Engineering found their time spent on email reduced by 60% using BIM Track on the Stockholm Subway Expansion Project, and OpenProject srl found their team’s email was reduced 90% on the Bonfiglioli Riduttori Industrial Facilities Project by using BIM Track. This calculator assumes a 50% time saving of 2 hours daily on email.
Using BIM Track’s automated reporting feature could save your team
hours
per year
Assumption:
Boustead Projects estimated their team cut down their weekly reporting time from 2-3 hours to 2 minutes using this feature on the 351 Braddell Industrial Business Development Project.
In total, using BIM Track on your projects could save your team approximately
hours
per year.
For a more detailed look at how BIM Track could improve your unique workflow,
get in touch for a free 1-1 consultation with one of our experts.
NB: This calculator is designed to provide an approximation of possible time savings based on client case study data. We can’t guarantee you’ll have exactly the same results!