ROI Calculator
How much time could your team firm company save?

This calculator is designed to give you an idea of where your team could generate a time-saving ROI using BIM Track. Our calculations are based on real-world data drawn from client case studies.

How big is your team?

How do you assign clashes to team members for resolution?

stopwatch

Using BIM Track’s clashes-to-issues feature could save your team

hours

per year

Assumption:
McVeigh & Mangum Engineering cut their coordination time in half by making extensive use of the clashes-to-issues feature on the Medical University of South Carolina renovation project. This calculator assumes a 20% time saving on the team’s total working hours.

Does your team locate assigned issues in the model manually?

Roughly how many times per day do your team members locate issues manually in the model?

stopwatch

Using BIM Track’s view in model feature could save your team

hours

per year

Assumption:
Austin Commercial estimated their team saved 2-5 mins per issue using this feature on the SLC International Airport Expansion Project. This calculator assumes a time-saving of 2 minutes per issue.

Do you communicate design feedback via email?

stopwatch

Using BIM Track’s in-context communication instead of email could save your team

hours

per year

Assumption:
Amberg Engineering found their time spent on email reduced by 60% using BIM Track on the Stockholm Subway Expansion Project, and OpenProject srl found their team’s email was reduced 90% on the Bonfiglioli Riduttori Industrial Facilities Project by using BIM Track. This calculator assumes a 50% time saving of 2 hours daily on email.

Does your team create coordination meeting reports manually?

stopwatch

Using BIM Track’s automated reporting feature could save your team

hours

per year

Assumption:
Boustead Projects estimated their team cut down their weekly reporting time from 2-3 hours to 2 minutes using this feature on the 351 Braddell Industrial Business Development Project.

stopwatch

In total, using BIM Track on your projects could save your team approximately

hours

per year.

Interested?

For a more detailed look at how BIM Track could improve your unique workflow,
get in touch for a free 1-1 consultation with one of our experts.

REQUEST YOUR LIVE DEMO

NB: This calculator is designed to provide an approximation of possible time savings based on client case study data. We can’t guarantee you’ll have exactly the same results!